Global Survey Form Filling Project

Operational Requirements

Payment Structure

Accuracy Parameter

1% Error is Consider

2% Error is 30% Deduct

3% Error is 50% Deduct

4% Error is 70% Deduct

5% Error is 90% Deduct

6% Error is 95% Deduct above Reject

Types Of Error

Punctuation error/Extra

Spelling error

Word Missing/Extra

Space/Extra (Last Extra Space)

Form Missing/Extra

Blank Cell

Form Mis – Match Small & Capital

Payment Structure

Payment-1000X2=2000

Error:-1000 X 1%=10 error Full Payment

1000 X 2% =20 error 70% Payment

1000 X 3% =30 error 50% Payment

1000 X 4% =40 error 30% Payment

1000 X 5% =50 error 10% Payment

1000 X 6% =60 error 5% Payment

Above Whole Work Reject No Re-Work

Demo Work